Faulty design, construction blamed in roof collapse
The Havre High School roof collapsed on Dec. 30 because it was designed to outdated standards and was then not built up to what was designed. That’s the finding of Thomas, Dean & Hoskins, the Great Falls engineering firm that conducted a study into the Dec. 30 roof collapse.
Read more on Havre Daily News